Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (oponent) ; Venkrbec, Václav (vedoucí práce)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Construction technology project of extension of the Supreme Court building in Brno
Coník, Šimon ; Venkrbec, Václav (oponent) ; Liška, Pavel (vedoucí práce)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
Preparation for the implementation of the multifunctional buildings in Bratislava
Janíček, Peter ; Průcha, Aleš (oponent) ; Kantová, Radka (vedoucí práce)
This diploma thesis deals with the preparation of the implementation of multifunctional buildings in Bratislava. These are three detached multi-storey apartment buildings connected by a joint basement. The diploma thesis includes a technical report to the construction technological project, a study of the implementation of main technological phases, solving of broader relations of transport routes with the design of supply routes, a time schedule and a financial plan of the object, a detailed time plan for the rough substructure and rough superstructure, a building site equipment project, a machine assembly design and its assessment, a technological regulation for monolithic structures, a control plan and test plan for monolithic structures, a specification of the time period of the removal of the formwork of monolithic structures, an occupational safety and health plan and selected points of the LEED certification. The thesis also includes a plan for securing resources for the rough structure with added schedules of workers, machines and building materials, a cost estimation budget of selected technological processes, a noise study, and a financial analysis of the expected investment profit.
Stavebně-technologický projekt pavilonu horského hotelu
Surý, Václav ; Fila, Lukáš (oponent) ; Novotný, Michal (vedoucí práce)
Diplomová práce řeší stavebně-technologický projekt pavilonu horského hotelu. Jedná se o přístavbu bazénové haly. Diplomová práce zahrnuje: pažení pomocí hřebíkových stěn, tryskovou injektáž, výkopové práce, železobetonovou základovou vanu. Je zde řešen zejména technologický předpis hřebíkových stěn a tryskové injektáže. Dále obsahuje řešení zařízení staveniště, časový plán, situaci stavby s řešením dopravních tras, položkový rozpočet, navrženou strojní sestavu, zásady bezpečnosti a ochrany zdraví při práci.
Preparation for the implementation of the multifunctional buildings in Bratislava
Janíček, Peter ; Průcha, Aleš (oponent) ; Kantová, Radka (vedoucí práce)
This diploma thesis deals with the preparation of the implementation of multifunctional buildings in Bratislava. These are three detached multi-storey apartment buildings connected by a joint basement. The diploma thesis includes a technical report to the construction technological project, a study of the implementation of main technological phases, solving of broader relations of transport routes with the design of supply routes, a time schedule and a financial plan of the object, a detailed time plan for the rough substructure and rough superstructure, a building site equipment project, a machine assembly design and its assessment, a technological regulation for monolithic structures, a control plan and test plan for monolithic structures, a specification of the time period of the removal of the formwork of monolithic structures, an occupational safety and health plan and selected points of the LEED certification. The thesis also includes a plan for securing resources for the rough structure with added schedules of workers, machines and building materials, a cost estimation budget of selected technological processes, a noise study, and a financial analysis of the expected investment profit.
Construction technology project of extension of the Supreme Court building in Brno
Coník, Šimon ; Venkrbec, Václav (oponent) ; Liška, Pavel (vedoucí práce)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (oponent) ; Venkrbec, Václav (vedoucí práce)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Stavebně-technologický projekt pavilonu horského hotelu
Surý, Václav ; Fila, Lukáš (oponent) ; Novotný, Michal (vedoucí práce)
Diplomová práce řeší stavebně-technologický projekt pavilonu horského hotelu. Jedná se o přístavbu bazénové haly. Diplomová práce zahrnuje: pažení pomocí hřebíkových stěn, tryskovou injektáž, výkopové práce, železobetonovou základovou vanu. Je zde řešen zejména technologický předpis hřebíkových stěn a tryskové injektáže. Dále obsahuje řešení zařízení staveniště, časový plán, situaci stavby s řešením dopravních tras, položkový rozpočet, navrženou strojní sestavu, zásady bezpečnosti a ochrany zdraví při práci.